CO-LOCATED SMALL MODULAR REACTORS AS AN ALTERNATE AC POWER SOURCE FOR LARGE NUCLEAR UNITS UNDER REGIONAL GRID CASCADING CONDITIONS: A DESIGN-BASIS ASSESSMENT FOR UZBEKISTAN

Authors

  • Turaeva Dilnavoz

DOI:

https://doi.org/10.5281/zenodo.22816938

Abstract

Uzbekistan’s first nuclear power plant will place two RITM-200N small modular reactors (SMRs) and two
VVER-1000 units on one site in the Jizzakh region. The SMR units arrive first, four to six years ahead of the first large unit.
The plant will connect to the Central Asian Power System, a synchronous interconnection shared with four neighbouring
states, which cascaded in August 2026 when the loss of 600 MW of hydroelectric generation propagated across four
countries and took roughly five hours to restore. Loss of off-site power is the dominant external initiator of station blackout.
A cascading interconnection failure is a common-cause event, removing every off-site source at once. Together these
facts raise a question the published literature has not examined: can co-located SMR units serve as an on-site alternate
AC power source for the large units during a wide-area grid collapse? This paper screens that question against five criteria
drawn from IAEA guidance on electrical power system design and station blackout provisions, namely capacity adequacy,
response time, independence, self-survival, and commissioning sequence. Capacity is not the constraint. A single
55 MWe RITM-200N unit exceeds the emergency AC demand of one safety train at a large pressurized-water reactor by
roughly an order of magnitude. The commissioning sequence is favourable as well, since the SMR units will have several
years of operating record before the first VVER-1000 needs them. Two findings limit the claim. The RITM-200N cannot
replace emergency diesel generators, which must accept load within ten to thirty seconds of a start signal; and it cannot
be credited at all unless it survives the grid event itself through house-load operation, a capability the public design literature
does not establish. The configuration is therefore a candidate for alternate AC credit rather than emergency power
replacement. The paper closes by defining the reliability analysis needed to settle it.

Keywords

station blackout, loss of off-site power, alternate AC power source, small modular reactor, RITM-200N, VVER- 1000, Central Asian Power System, Uzbekistan.

Author Biography

Turaeva Dilnavoz

Master’s Student, KEPCO International Nuclear Graduate School (KINGS), Ulsan, Republic of Korea

References

U.S. Nuclear Regulatory Commission, Reevaluation of Station Blackout Risk at Nuclear Power Plants, NUREG/

CR-6890, Washington, DC, 2005.

“Uzbekistan Breaks Ground on 2.1 GW Jizzakh NPP Under a $9.5 Billion Rosatom Partnership,” Construction Review

Online, 2026.

“Uzbekistan’s 110 MW Nuclear Plant to Cost Under $1 Billion,” Caspianpost.com, 2026.

P. Chorshanbiev, “Blackout in Central Asia’s energy ring: did Tajikistan become more vulnerable by joining the unified

energy system?,” Asia-Plus, Aug. 21, 2026.

Multinational Design Evaluation Programme (MDEP), VVER Working Group, Preliminary Analyses and Comparison

of Design Differences between VVER-1000 Reactors, Technical Report TR-VVERWG-06, OECD/NEA, Mar. 2019.

V. V. Petrunin, N. V. Sheshina, S. A. Fateev, A. V. Kurachenkov, D. V. Shchekin, S. M. Brykalov, and A. A. Bezrukov,

“Scientific and technical aspects of developing a RITM-200N innovative reactor for SNPPs,” Atomic Energy, vol. 134,

no. 1, pp. 1–10, 2023, doi: 10.1007/s10512-023-01020-4.

Tracey, “The RITM-200N reactor as a terrestrial unit,” Nuclear Engineering International, Jun. 26, 2024.

International Atomic Energy Agency, Design of Electrical Power Systems for Nuclear Power Plants, IAEA Safety

Standards Series No. SSG-34, IAEA, Vienna, 2016.

International Atomic Energy Agency, Design Provisions for Withstanding Station Blackout at Nuclear Power Plants,

IAEA-TECDOC-1770, IAEA, Vienna, 2015.

International Atomic Energy Agency, Electric Grid Reliability and Interface with Nuclear Power Plants, IAEA Nuclear

Energy Series No. NG-T-3.8, STI/PUB/1542, IAEA, Vienna, 2012.

K. P. Praise and H.-k. Lim, “Time-Dependent Evaluation of Station Blackout and FLEX Integration in a Newcomer

Nuclear Program: A Case Study of Uganda,” Energies, vol. 18, no. 22, art. 5945, 2025, doi: 10.3390/en18225945.

U.S. Nuclear Regulatory Commission and Idaho National Laboratory, Loss of Offsite Power Initiating Event Data,

Reactor Operational Experience Results and Databases, nrcoe.inl.gov.

U.S. Nuclear Regulatory Commission, Emergency Diesel Generators as Emergency Power Sources, Technical

Training Center reference material, ML11229A062.

C. Boudot, J.-B. Droin, P. Sciora, Y. Besanger, B. Robisson, and A.-L. Mazauric, “Small Modular Reactor-based

solutions to enhance grid reliability: impact of modularization of large power plants on frequency stability,” EPJ Nuclear

Sci. Technol., vol. 8, art. 16, 2022, doi: 10.1051/epjn/2022015.

M. S. H. Talukder, M. T. Hasan, and I. M. Shafiqul, “Addressing the Grid Integration Challenges of Rooppur Nuclear

Power Plant: A Comprehensive Analysis,” SSRN preprint, Sep. 2024, doi: 10.2139/ssrn.4951635.

Downloads

Published

2026-09-01
Vol. 4 No. 9 (2026): «Muhandislik va Iqtisodiyot» jurnali 9-son